|  | 设计工作流程Design Work Schedule :
 
 1.填写项目接洽单
 To Fill in the Application Form;
 
 2.签订相关协议并支付定金
 To Sign the Agreement  & Send the Deposit to dcb;
 
 3.确认主要国际设计师及概念方案,一般为签协议后2周内完成,包括设计建议书和装修平面图
 To confirm main international Designer for this  project and the Concept Design,  normally two weeks,including proposal and plan;
 
 4.确认初步方案及参加现场定期协调会,包括设计说明,平面图,立面图和主要区域效果图
 To confirm the schematic design and hold the  regular coordination meeting on site.  including design specification, plans, elevations and perspectives of main area
 
 5 配合施工单位完成施工图,包括结构改造图,地面布置图,家具布置图,灯具布置图,以及建材,配饰产品清单,以及节点详图等
 To coordinate with the Contractor & finish the  working drawings, including structure  drawing, floor plan, furniture plan, lighting plan, and the list  of building materials, decoration items and equipment product, detail drawings,  etc.
 服务种类 Service Type:
 1.室内设计项目接洽单(Interior Design)
 2.室外景观设计项目接洽单(Landscape Design) 客服中心 Service Center 
        Tel: 86 10-64956392 
 |  |